Falco Intersects 10.0 Metres At 10.0 g/t AuEq at Quemont and Provides Regional Exploration Update

31 October 2016

MONTREAL, QC –(Marketwired – October 31, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to report three additional drill results from its 2016 exploration program at its 100% owned Horne 5 project located in Rouyn-Noranda, Québec. Additionally, the Company is pleased to report results from its 2016 regional exploration and prospection program. Luc Lessard, […]

Falco Drills 12.4 Metres at 5.14 g/t AuEq at Horne 5 West Extension

13 September 2016

MONTREAL, QC –(Marketwired – September 13, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to report the three (3) initial drill results from its 2016 exploration and development program at its 100% owned Horne 5 project located in Rouyn-Noranda, Québec. The two (2) initial holes were drilled in the existing Horne 5 mineralized envelope. […]

Falco Secures Ownership of the Horne 5 Project

6 September 2016

MONTREAL, QC –(Marketwired – September 06, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to announce that it has retained full ownership of the Horne 5 Project. “We are pleased to have confirmed the full ownership of the project, which is located in the prolific Rouyn-Noranda mining camp. We look forward to bringing this world-class […]

Falco Announces Exercise of Oustanding Warrants

28 June 2016

MONTREAL, QC –(Marketwired – June 28, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to announce that as of June 27th 2016, all outstanding warrants issued as part of the July 22, 2015 private placement completed with strategic Québec Funds and Osisko Gold Royalties Ltd and which expiry date had been accelerated have been all exercised by the holders. […]

Falco Files Preliminary Economic Assessment Technical Report for Horne 5 Project

23 June 2016

MONTREAL, QC –(Marketwired – June 23, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to announce that it has filed today on SEDAR a National Instrument 43-101 technical report for its wholly-owned Horne 5 gold project located in Rouyn-Noranda, Québec. Falco’s news release dated May 9th, 2016 summarizes the assumptions and key results contained in the […]

Falco Announces Acceleration of Outstanding Warrants for Proceeds up to C$1.2M

21 June 2016

MONTREAL, QC –(Marketwired – June 21, 2016) – Falco Resources Ltd. (TSX VENTURE: FPC) (“Falco” or the “Company) is pleased to confirm that the Company has elected to accelerate to July 17, 2016 the expiry date of 2,312,500 warrants (the “Warrants”) issued as part of the July 22, 2015 private placement completed with strategic Québec Funds and Osisko Gold Royalties Ltd. and which were originally […]

Falco Enters Into $10 Million Loan Financing With Osisko Gold Royalties

30 May 2016

Lays Groundwork for Silver and/or Gold Stream Financing MONTREAL, QC –(Marketwired – May 30, 2016) – Falco Resources (TSX VENTURE: FPC) (“Falco” or the “Company) is pleased to announce the closing of a financing with Osisko Gold Royalties Ltd. (TSX: OR) (“Osisko”) whereby Osisko will provide a C$10 million loan (“Loan”). The Loan will be used for the advancement of the Horne 5 […]

Falco Announces Positive Preliminary Economic Assessment on Horne 5 Gold Project

9 May 2016

MONTREAL, QC –(Marketwired – May 09, 2016) – Falco Resources (TSX VENTURE: FPC) — Top Quartile Project at All-In Sustaining Costs of US$427/oz Au, net of By-Product Credits — All-In Cost (CAPEX plus OPEX) at US$660/oz Au — Annual Gold Production of 236,000 Ounces for 12 Years — After-Tax IRR of 16.0%; Falco Resources (TSX VENTURE: FPC) (“Falco” or the […]

Falco Mobilizes Two Drills to Horne 5

26 April 2016

20,000 Meter Drill Program Planned for 2016 MONTREAL, QC –(Marketwired – April 26, 2016) – Falco Resources (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to announce that it is starting a new surface drilling program at the Company’s 100% owned Horne 5 project. Two diamond drill rigs will be active on the property, targeting the Horne 5 […]

Falco Files Technical Report for Horne 5 Resource

7 March 2016

Receives Dewatering Permit for Quemont 2 Shaft MONTREAL, QC –(Marketwired – March 07, 2016) – Falco Resources (TSX VENTURE: FPC) (“Falco” or the “Company”) is pleased to announce that the Company has today filed on SEDAR a National Instrument 43-101 compliant technical report for its wholly-owned Horne 5 gold project located in Rouyn-Noranda, Québec. Falco’s news release dated January 25th, 2016 summarizes […]